Period Field
Extracts one field from schedule period information.
Extracts one field from schedule period information.
When to use
Use it when a Portfolio path needs a period boundary or label as a scalar value.
Example
Extract the current period label for a rebalance summary message.
Use the schedule's actual period
Connect Schedule Trigger: Period to Period Field. Select Start or End when a downstream decision needs a boundary timestamp, Frequency when it needs the cadence, or Index and Label for identification. For a weekly Monday activation, the period describes the resolver's actual scheduled window; do not reconstruct its end by adding seven times 24 hours to a display date. Inspect the run's time reference and the extracted timestamps, particularly around market sessions or daylight-saving changes. This node provides data only; Schedule Trigger remains the control activation.
Common problems
Connect period information from the schedule context. Timezone and schedule configuration affect its meaning.
Next steps
Review the generated Parameters, Outcomes, and Data Ports on this page, then open the related guides for the complete workflow.
Related documentation
- Schedule TriggerStarts a strategy on a recurring calendar schedule.
- Configure Settings and visual preferencesConfigure local canvas preferences separately from strategy timezone, market hours, trading days, and default leverage.
- Build Portfolio strategiesDesign a scheduled or safety-driven graph that selects assets, calculates weights, applies limits, and rebalances.