Skip to documentation
Screebits Docs
Flow Editor
Open Screebits
  • Screebits
  • Flow Editor documentation
  • Blueprints
  • Your first steps in Screebits
  • Workspace, strategies and account
  • Get started with the Flow Editor
  • Build an RSI Momentum Alert
  • Flow Editor concepts
  • How a strategy starts and continues
  • Control and data connections
  • Nodes, parameters, outcomes, and ports
  • Plans and feature availability
  • Saves, versions, and checkpoints
  • Tactical and Portfolio strategies
  • Validation and readiness
  • Flow Editor mode guides
  • Build Portfolio strategies
  • Build Tactical strategies
  • Flow Editor guides
  • Add a Quant Hub metric
  • Configure a node
  • Configure Settings and visual preferences
  • Connect nodes
  • Create a strategy
  • Create checkpoints and restore versions
  • Reset a Flow safely
  • Debug and replay a Backtest
  • Fix validation issues
  • Use keyboard shortcuts
  • Manage variables
  • Run a Backtest
  • Save and resolve conflicts
  • Work on tablet and mobile
  • Use Quick add
  • Use the Inspector
  • Add, move, duplicate, and remove nodes
  • Flow Editor examples
  • Portfolio rebalance with risk limits
  • Tactical order and position monitoring
  • Use Backtest Center
  • Read a Backtest result
  • Compare and export Backtests
  • Explore Quant Hub
  • Metric parameters, charts and overlays
  • Flow Editor node reference
  • Period Field
  • Flow Editor troubleshooting
  • Troubleshoot activation and validation
  • Troubleshoot Backtests and replay
  • Troubleshoot compact layouts
  • Troubleshoot connections and data types
  • Troubleshoot plans and locked features
  • Troubleshoot Quant Hub in the Flow Editor
  • Troubleshoot save, offline, and conflicts
  • Backtests and responsible use
  • Flow Editor glossary
  1. Screebits
  2. /Flow Editor documentation
  3. /Flow Editor node reference
  4. /Period Field
IntermediateLast verified Sep 30, 2026

Period Field

Extracts one field from schedule period information.

On this page
  1. When to use
  2. Example
  3. Use the schedule's actual period
  4. Common problems
  5. Next steps

Extracts one field from schedule period information.

When to use

Use it when a Portfolio path needs a period boundary or label as a scalar value.

Example

Extract the current period label for a rebalance summary message.

Try it here

Explore Period Field

Extracts one field from schedule period information.

Exercise steps
  1. Choose a different field in Inspector.
  2. Observe how the active output and its type change; the connected input keeps its structured value.
Schedule TriggerPeriod Field
Graph preview — a diagram of the example

Use the schedule's actual period

Connect Schedule Trigger: Period to Period Field. Select Start or End when a downstream decision needs a boundary timestamp, Frequency when it needs the cadence, or Index and Label for identification. For a weekly Monday activation, the period describes the resolver's actual scheduled window; do not reconstruct its end by adding seven times 24 hours to a display date. Inspect the run's time reference and the extracted timestamps, particularly around market sessions or daylight-saving changes. This node provides data only; Schedule Trigger remains the control activation.

Common problems

Connect period information from the schedule context. Timezone and schedule configuration affect its meaning.

Next steps

Review the generated Parameters, Outcomes, and Data Ports on this page, then open the related guides for the complete workflow.

Node facts

These facts come from the current Flow Editor node catalog.

Node type
Period Field
Activation role
No activation role
Category
Field
Availability
Portfolio only
Modes
Portfolio
Required plan
None
Behavior
Transforms a value
Control inputs
0
Output data types
datetime, Text, Number

Parameters

NameInput typeRequirementDefaultOptions and constraints
Period fieldSelection listRequiredstartOptions: Start, End, Frequency, Index, Label

Primary parameters

  • Period field

Outcomes

None

Data inputs

  • Periodperiod Info · Required

Data outputs

  • StartdatetimeShown when Period field is start
  • EnddatetimeShown when Period field is end
  • FrequencyTextShown when Period field is frequency
  • IndexNumberShown when Period field is index
  • LabelTextShown when Period field is label

Related documentation

  • Schedule TriggerStarts a strategy on a recurring calendar schedule.
  • Configure Settings and visual preferencesConfigure local canvas preferences separately from strategy timezone, market hours, trading days, and default leverage.
  • Build Portfolio strategiesDesign a scheduled or safety-driven graph that selects assets, calculates weights, applies limits, and rebalances.

On this page

1 / 5
  1. When to use
  2. Example
  3. Use the schedule's actual period
  4. Common problems
  5. Next steps

Practical guidance for strategies, historical simulations and metric research in Screebits.

Responsible useGlossary