Skip to documentation
Screebits Docs
Flow Editor
Open Screebits
  • Screebits
  • Flow Editor documentation
  • Blueprints
  • Your first steps in Screebits
  • Workspace, strategies and account
  • Get started with the Flow Editor
  • Build an RSI Momentum Alert
  • Flow Editor concepts
  • How a strategy starts and continues
  • Control and data connections
  • Nodes, parameters, outcomes, and ports
  • Plans and feature availability
  • Saves, versions, and checkpoints
  • Tactical and Portfolio strategies
  • Validation and readiness
  • Flow Editor mode guides
  • Build Portfolio strategies
  • Build Tactical strategies
  • Flow Editor guides
  • Add a Quant Hub metric
  • Configure a node
  • Configure Settings and visual preferences
  • Connect nodes
  • Create a strategy
  • Create checkpoints and restore versions
  • Reset a Flow safely
  • Debug and replay a Backtest
  • Fix validation issues
  • Use keyboard shortcuts
  • Manage variables
  • Run a Backtest
  • Save and resolve conflicts
  • Work on tablet and mobile
  • Use Quick add
  • Use the Inspector
  • Add, move, duplicate, and remove nodes
  • Flow Editor examples
  • Portfolio rebalance with risk limits
  • Tactical order and position monitoring
  • Use Backtest Center
  • Read a Backtest result
  • Compare and export Backtests
  • Explore Quant Hub
  • Metric parameters, charts and overlays
  • Flow Editor node reference
  • Flow Editor troubleshooting
  • Troubleshoot activation and validation
  • Troubleshoot Backtests and replay
  • Troubleshoot compact layouts
  • Troubleshoot connections and data types
  • Troubleshoot plans and locked features
  • Troubleshoot Quant Hub in the Flow Editor
  • Troubleshoot save, offline, and conflicts
  • Backtests and responsible use
  • Flow Editor glossary
  1. Screebits
  2. /Flow Editor documentation
  3. /Flow Editor guides
  4. /Add, move, duplicate, and remove nodes
BeginnerLast verified Sep 11, 2026

Add, move, duplicate, and remove nodes

Use the palette and canvas to organize the graph without losing the meaning of its paths.

On this page
  1. Add a node
  2. Arrange and inspect
  3. Duplicate or remove

Use the palette to add nodes that are available for the current mode and plan.

Add a node

Open the palette, search or expand a category, then select a node to add it. You can also drag a node to a specific canvas position. A locked card explains availability; it cannot be added by bypassing the interface.

A second primary activation cannot be added or duplicated. Use Replace primary explicitly; the last primary cannot be deleted. Review the replacement parameters and connections before saving.

Try it here

Add and arrange a node

Add a relevant node from the palette and arrange it on the canvas.

Exercise steps
  1. Add an Alert from the lesson palette.
  2. Move the new node, then use Undo to reverse the move and insertion.
Event TriggerData SourceIndicatorConditionAlert
Graph preview — a diagram of the example

Arrange and inspect

Drag nodes to make control direction and data dependencies easy to read. Use Fit view when part of the graph is outside the viewport. Auto-layout can reorganize the complete graph; create a checkpoint first when the current arrangement matters.

Duplicate or remove

Select a node, then use the available selection action or command. Duplication creates a separate node and does not automatically recreate every relationship. Removing a node also affects its connected edges.

Undo immediately when the result is not what you intended. Validate after structural changes and save when the graph is correct.

Related documentation

  • Configure a nodeEdit required and optional parameters, then review any ports or connections affected by the change.
  • Connect nodesCreate a compatible control or data connection and verify the resulting path.
  • Flow Editor node referenceBrowse every node currently available to add, with generated facts and practical guidance.

On this page

1 / 3
  1. Add a node
  2. Arrange and inspect
  3. Duplicate or remove

Practical guidance for strategies, historical simulations and metric research in Screebits.

Responsible useGlossary